PRS Publications

Have this publication emailed to you.

Methane Emissions from a Constructed Wetland: The Sandhill Fen 10 years post construction as an oil sand reclamation project

Obeda, K.. 2026.

Abstract

The Sandhill Fen Watershed is a large-scale wetland reclamation project in Canada%u2019s oil sands. Methane emissions were low during the first three years after construction (2013-2015). It was hypothesized that unfavourable redox conditions for methanogenesis due to alternative electron acceptors like sulfur may decrease with time. In 2022, methane emissions were measured at 20 plots along with ion adsorption rates in the soil. Sulfur adsorption rates were significantly lower, and methane emissions were significantly greater in 2022 than in 2015. However, methane emissions remained low with median emissions of 0.06 mg C-CH4 m-2 h-1 , which was significantly affected by the presence of vegetation. One plot displayed persistently elevated emissions exceeding 1.9 CH4 mg-2h-1 , but was not representative of the whole site. Ebullition was also more frequent in 2022, but overall, the Sandhill Fen Watershed does not yet show conditions favourable for elevated methane emissions.