Ecohydrological implications of road construction and reclamation: Interim data report
Petrone, R. M.. 2012. Wilfrid Laurier University
Abstract
The JACOS Hangingstone development is located approximately 49 km southwest of Fort
McMurray within township 84, range 11, west of the 4th meridian (Figure 1). The project was
originally initiated as a Cyclic Steam Stimulation (CSS) pilot project in 1983. The development
was converted to a demonstration project in 1999 to assess the applicability of Steam Assisted
Gravity Drainage (SAGD) for bitumen recovery from deeper deposits typical of the JACOS
lease. Presently, the project recovers and processes bitumen from 4 well pads with a total of 12
well pairs.